Add a New Job
Before adding a New Job…
The following questions will help guide you through how to create or set up a Job in Prestartr, or determine is another feature, such as a Work Order, might be more appropriate.
- Do you need to track a specific budget for the work?
- Do you need to keep a daily attendance register?
- Do you need to maintain an asset allocation register?
If you don't need any of the above points, you might be better suited for a Work Order.
General Details

This section has the initial and crucial details needed to create a Job in Prestartr.
The most critical fields include the Name, Client, and Zone - most other areas of the system will require these fields to function correctly.
Name | Code |
The name of the Job. | The shorthand for the Job. |
Zone | Status |
The team for the Job. | The status of this job. |
Groups | Address |
Is the Job part of a group? | The address of the job. |
Client | Client Representative |
The Client for the job. | The user liaison. |
Purchase Order # | Job Markup % |
The Client PO. | The markup. |
Assigned Users | |
Assigned users. | |
Notes | |
Overall notes. |
Job Shift Rules
Default Start Time | Default End Time |
The starting time of the Day shift. | The ending time of the Day Shift. |
Default Lunch Start Time | Default Lunch End Time |
The start of the Lunch period. | The end of the Lunch period. |
Default Lunch Break Duration (Hrs) | Default Lunch Break Days |
Duration in hours of the Lunch period. | Which days does a Lunch Break apply. |
Default Minimum Shift Duration (Hrs) | |
The minimum number of hours for a Shift. |
Scheduling Details
Default Notification Message | |
The content of the notification, if any, that is sent. | |
Mandatory Training and Induction | |
The related Qualification needed for this Job. | |
Default Schedule Start Time | Default Schedule End Time |
The start time of the standard Schedule. | The end time of the standard Schedule. |
Default Schedule Night Start Time | Default Schedule Night End Time |
The start time of the standard Night Schedule. | The end time of the standard Night Schedule. |
Notify Users Before Allocation | |
Enable or disable notification for users when allocated. | |
Push Notification Type | Push Notification Message Title |
Yes and No is the only current available option - this is the options displayed to the end user from the notification. | The title of the push notification. |
Push Notification Response Email List | |
A list of emails that will be informed of the responses selected by users from the Push Notification. |
Cost Control Details
First Claim Period Start Date | First Claim Period End Date |
For setting up your Project Claim dates, the start date for the first Claim. | This is the end date of the first Claim. |
Claim Per Calendar Month | |
Yes or No if you want to make a claim per calendar month. |
Rental Details
Rental Contract Name | Dockets Require SMU? |
Name of the rental contract. | Does the docket require the current odometer. |
Bill by SMU? | |
Billing by Odometer on the Plant. | |
Docket Recipients | |
Who will recieve the docket. |
Files
When creating a Job, you can upload images and PDF files to it prior to adding the job to the system.
If you do not click Create Job, you will need to re-upload any files you had previously uploaded.